|
Post by SRW on Apr 19, 2010 6:44:56 GMT -5
I was pondering earlier what will the final stage involve now? we had spider climb - rope climb, ladder climb - rope climb so now what??? hmmm......
Ive my own idea what I think it should be but I cannot say as it would spoil future stickman sasuke episodes lol so have to keep it quiet for now.
But discuss.....
|
|
|
Post by artyfowljr on Apr 19, 2010 7:42:30 GMT -5
I say it's going to be eather Spider Climb + multiple ropes, or Spider Climb + Ladder + rope.
|
|
|
Post by SRW on Apr 19, 2010 8:48:08 GMT -5
All I know for a fact is its still 23 meters high so within those boundries.
|
|
Lennon
Levi Meeuwenberg
Posts: 793
|
Post by Lennon on Apr 19, 2010 9:25:07 GMT -5
I was actually thinking about this. Since we are bringing back obstacles from the past. What if they just make the Final Stage a Rope Climb like it was in 1-4? Except this time it would be longer.
|
|
|
Post by SRW on Apr 19, 2010 9:32:50 GMT -5
I should point Brian O told me its still 23m so thats good enough for me.
Lennon: one or two people have said this I personally think it woulda kinda be a step down a little plain ya know but for difficulty hell yea its good.
|
|
venomcarnage89
Morikami Daisuke
A perfect stone creates ripples, the best intentions can have consequences.
Posts: 266
|
Post by venomcarnage89 on Apr 19, 2010 9:45:19 GMT -5
I was one of the ones who said it, but I really hope thats not it, I agree it would be a little plain, I want something exciting. Spider climb with multiple ropes or maybe some slightly inverted weird kind of rock climbing wall to rope climb. I say weird kind of rock climb wall just because if its too much like a traditional rock climb that would look like it was made for Lee En Chi to win, has to be something he can't just run right up.
|
|
FAMAS
Morikami Daisuke
Posts: 270
|
Post by FAMAS on Apr 19, 2010 11:49:39 GMT -5
Viking's final stage would be great.
|
|
|
Post by artyfowljr on Apr 19, 2010 12:37:48 GMT -5
Nah, that's pretty much impossible at this point. It still looks like a normal tower. And IMO it should remain a tower Not that I don't like Viking's final stage, it's just a personal preference.
|
|
|
Post by VenusHeadTrap on Apr 19, 2010 12:38:03 GMT -5
but would probably be a rip off since everyone is excited for what it could be and when someone finally beats stage 3 it's something a lot of people have already seen.
|
|
venomcarnage89
Morikami Daisuke
A perfect stone creates ripples, the best intentions can have consequences.
Posts: 266
|
Post by venomcarnage89 on Apr 19, 2010 13:27:14 GMT -5
I think I came up with a cool idea. A spider climb to rope clumb where in stead of after 15 seconds the entire spider climb separates, you have the slider climb able to be pulled away gradually, like the first 5 feet pull away but not the rest, so you have to keep going fast as the pieces under you are pulling away right underneath you, gives me the feel of an Indiana Jones movie. Then either at the end do a regular rope climb or make it two ropes, i vote for two ropes, just make the spider climb a few feet shorter so the ropes can be longer.
|
|
|
Post by ansem120 on Apr 19, 2010 13:31:02 GMT -5
I was actually thinking about this. Since we are bringing back obstacles from the past. What if they just make the Final Stage a Rope Climb like it was in 1-4? Except this time it would be longer. Well, from my prespective, I thought it looked like there was just a rope dangling from the Final Tower in the "line-up" picture they always take. Nothing else, just a rope. Now, I highly doubt it, but what if M9 hasn't built the Final Stage they want for this new era yet? I mean, they only had 3 months between 24 and 25 to build a new, more difficult Final Stage. Plus, why would you rush making the new Final Stage when there was about a .1% chance that anyone would beat that new 3rd Stage in the first place? Again, I don't think M9 would be stupid/brave enough to risk that, but it's just a thought I had.
|
|
FAMAS
Morikami Daisuke
Posts: 270
|
Post by FAMAS on Apr 19, 2010 14:20:21 GMT -5
I was actually thinking about this. Since we are bringing back obstacles from the past. What if they just make the Final Stage a Rope Climb like it was in 1-4? Except this time it would be longer. Well, from my prespective, I thought it looked like there was just a rope dangling from the Final Tower in the "line-up" picture they always take. Nothing else, just a rope. Now, I highly doubt it, but what if M9 hasn't built the Final Stage they want for this new era yet? I mean, they only had 3 months between 24 and 25 to build a new, more difficult Final Stage. Plus, why would you rush making the new Final Stage when there was about a .1% chance that anyone would beat that new 3rd Stage in the first place? Again, I don't think M9 would be stupid/brave enough to risk that, but it's just a thought I had. I don't think that was the rope, looked like the safety cord that they attach onto competitors. And arty, yes I was aware it probably won't happen. But I thought it was a good idea, I wouldn't mind it finishing off Stage 3 either, maybe make it a bit smaller though.
|
|
Lennon
Levi Meeuwenberg
Posts: 793
|
Post by Lennon on Apr 19, 2010 14:27:28 GMT -5
MAYBE... You have to jump 23 meters into the air from a trampoline! 0.0 PERFECT!
|
|
|
Post by theannoyingninja on Apr 19, 2010 14:29:26 GMT -5
I think that they are going to use some newer obstacle that tires you out even more than the ladder. I do think that the rope will stay.
|
|
|
Post by YoDaUO on Apr 19, 2010 14:52:54 GMT -5
I think it might be Spider Climb + Ladder + rope. I hope its something new though. If they put a rock wall in then lee would destroy that. haha.
I liked the original final stage of just rope but its unlikely they will do that again.
|
|
|
Post by jfeathe on Apr 19, 2010 15:30:45 GMT -5
How about a vertical metal pole with small spherical notches every half meter to place your feet on for the first 13 meters. To visualize, think about a metal skewer with peas skewered through it.
And then a 10 meter net climb with the first half of the net a rope net, and then the second half a bungee net.
|
|
|
Post by mikessssssss on Apr 19, 2010 16:16:09 GMT -5
How about a 23 metre high salmon ladder? But seriously, an extended salmon ladder then a rope climb?
|
|
chackpop
David Campbell
25%
Posts: 1,543
|
Post by chackpop on Apr 19, 2010 16:35:34 GMT -5
I'd like a sort of Spider Climb followed by a net climb similiar to First Stage's Rope Ladder and then a Rope Climb.
30 m. of Spider 25 m of Net 18 m of Rope
It's somewhat original and the time limit would be around 40 Seconds.
|
|
|
Post by SRW on Apr 19, 2010 17:25:30 GMT -5
I was actually thinking about this. Since we are bringing back obstacles from the past. What if they just make the Final Stage a Rope Climb like it was in 1-4? Except this time it would be longer. Well, from my prespective, I thought it looked like there was just a rope dangling from the Final Tower in the "line-up" picture they always take. Nothing else, just a rope. Now, I highly doubt it, but what if M9 hasn't built the Final Stage they want for this new era yet? I mean, they only had 3 months between 24 and 25 to build a new, more difficult Final Stage. Plus, why would you rush making the new Final Stage when there was about a .1% chance that anyone would beat that new 3rd Stage in the first place? Again, I don't think M9 would be stupid/brave enough to risk that, but it's just a thought I had. When people get as complacent as that no ones gonna do well its usually exactly when it would come and bite them in the a** lol. I think its 99% that it will involve a rope climb - id be ASTONISHED if the rope climb trademark was dropped.
|
|
|
Post by RobbyMac on Apr 19, 2010 19:00:35 GMT -5
How about 15 M rope climb from the old stage 1. Like from Sasuke 3-17 (use a wall to help you climb up the rope) into a traditional rope climb 15 M. 40 second time limit.
|
|